Related documents Search history  |  Help

[ clip ERCOT admits Texas grid faces risk of ‘cascading outages’ in wait for new CPS transmission line ]

1 document(s) related     Misc. items: 1

Other
Clips
Reports of the Electric Reliability Council of Texas; Notice regarding new south Texas export and import Generic Transmission Constraints (No. 55999, reiterating a need to boost transmission capacity between the southern and northern regions of Texas and predicting cascading outages if rolling blackouts aren't instituted). (Link Type: Agency Document)
See: https://interchange.puc.texas.gov/Documents/55999_22_1376923.PDF
By Public Utility Commission of Texas (PUC)
Publication Date: March 18, 2024